Информация о файле
Operation Instruction 1.Press “Power” on remote control to turn on. 2.Operation Process Date Push “INPUT-PC” on remote control. Press “MENU” +1147 to enter into factory mode, and choose “General Setting” by direction key and enter this option by the right key; and choose “Burning Mode” by direction key and turn “On” to “Off” by pressing right key. 3 Press “MENU” to exit. And press direction key to enter into “E2PROM Setting”, and select “ResetVGA DDC” by direction key and reset VGA DDC by right key. And then select “Reset E2prom” forprogram initial. After the initial, automatic turn off. 4 Make a test record on the process card. If no problem tested, turn off and remove wires to go for next step. TotalCautions 1. The operator must wear cotton gloves and anti-static ring; 2. Insert signal line before power on during the test 3. During the operation, safety should be ensured. After the test, signal line (remove the terminal only instead of the body) cannot be dropped into conductor rail. 4. During the test, any abnormal should be recorded in process card to indicate abnormal phenomenon found in which step. 5. The figures are supplied only for your reference.
SPV7050P
SPHE1003A-G
Рекомендуемые комментарии
Комментариев нет
Для публикации сообщений создайте учётную запись или авторизуйтесь
Вы должны быть пользователем, чтобы оставить комментарий
Создать аккаунт
Это очень просто!
РегистрацияВойти
Уже есть аккаунт? Войти в систему.
Войти